For the complete documentation index, see llms.txt. This page is also available as Markdown.

Configure a meter change

Configure meter replacement

A The meter may fail or be replaced by a new one . If only the new meter reading were adopted, already recorded values could be lost, which would lead to data gaps and calculation errors .

To prevent this, Eliona offers the option to configure an offset — either manually or via automatic detection.

Set an offset for a meter

  1. Open the asset details of the affected asset.

  2. Click the attribute, for which the offset is to be configured [A].

  3. Activate the offset function [B].

  4. Choose one of the following methods:

    • Enter value manually: The offset value is permanently added to all new measured values.

    • Enable automatic calculation: Eliona automatically detects when a meter replacement has occurred.

      • If the new value drops by more than 10%, an offset is set automatically.

      • Instead of continuing to count with the new value, the previous value remains as the base preserved.

Was this helpful?